Jump Start
We design, engineer, and build bouldering, top-rope, and traverse climbing walls — from site survey and structural design to fabrication, installation, and EN 12572 handover.
What we build
Survey & design
Site survey, 3D wall geometry, route-setting layout, and fall-zone planning.
Structural engineering
Steel frame, load paths, anchor design, and EN 12572 / engineer sign-off.
Fabrication
CNC-cut panels, dense T-nut grids, custom volumes, and a textured climbing surface.
Installation & handover
On-site build, holds, certified matting, load testing, and sign-off.
Full climbing-wall fit-out
Bouldering, top-rope, and traverse walls in one build — engineered steel structure, textured panels, and certified matting, delivered to EN 12572.
Have a wall to build?
From site survey to certified handover
Survey & design
Site survey and measurement, 3D wall geometry, route-setting layout, and fall-zone planning — modelled before a single panel is cut.
Structural engineering
Steel frame, continuous load paths, anchor design, and structural sign-off — aligned to EN 12572 and CWA practice.
Fabrication
CNC-cut plywood panels, dense T-nut grids, custom volumes, and a durable textured climbing surface.
Installation & handover
On-site assembly, holds and volumes, certified impact matting, load testing, and a documented handover.
Bring us the hard part.
Full climbing-wall fit-out
A climbing gym needed a full wall fit-out — bouldering, top-rope, and traverse walls — engineered, fabricated, and installed to standard, on a fixed opening date.
We took it from site survey to certified handover: 3D wall design and route-setting layout across all three wall types, an engineered steel structure on a continuous load path, CNC-cut textured panels with a dense T-nut grid, holds and volumes, and certified impact matting — load-tested and signed off to EN 12572.
- —Engineered steel frame on a continuous load path
- —18mm panels, dense T-nut grid, textured surface
- —Certified impact-absorbing matting (EN 12572-2)
- —Load-tested protection points & documented handover
Request a quote
Tell us about your wall — type, area, height, and timeline. We reply within two business days with a scoping call and a rough order of magnitude.
Request received
Reference JS-RFP-1182. We'll be in touch within two business days.